# Feature OP-15165 - FTE field (Full Time Equivalent)

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-15165

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 2 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

## Situation

In order to plan efficiently, we estimate open work-packages. Based on 40h/week FTE, team leads would find it very helpful to estimate if the allocated personnel is even mathematically suffcient to execute all planned work.

A good solution would be an FTE field that updates daily to reflect the required amount of peronnel. This FTE field allows a couple of usage scenarios:

1.  For **planning**: FTE field shows 2 =&gt; teamlead can allocate specific personnel to the PHASE
    
2.  For **problem detecting** via a dedicated view: FTE field shows large number =&gt; new planning required
    
3.  For focussing on the **most important** SUBPHASES only: smaller parts of a project might require 0.1 FTE which is nothing compared to larger and more intense SUBPHASES like machine commissioning (FTE=1.2) which also could require overtime.
    
4.  basis for further calculation e.g. named personnel allocation in OpenProject - FTE field as described here would help a lot without that functionality
    

## User Story

**As** a team lead or project lead  
**I want to** look at an &quot;FTE field&quot; that shows the required personnel in FTE as of today  
**so that** I can easily detect whether or not the quantity of planned personnel is sufficient for a current PHASE.

**Acceptance criteria**

*   new field with the following functionality
    
    *   updates daily at midnight
        
    *   calculation = remaining work / (due date - today)
        
*   ideally
    
    *   due date - today = workhours only = 40h if 5 workdays