# Feature OP-15087 - Add "Spent time" as a filter into Time and costs

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-15087

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a OpenProject user&nbsp;  
**I want to** be able to create a cost report even for activities on which there is no time spent  
**so that** when I use a version as a filter, I can create a cost report even with the work package with no spent time (for example: if in a sprint a developer was unable to work on a task/US, I would like to be able to also display that task/us in the cost report)

**Acceptance criteria**

*   In Time and costs -&gt; New cost report -&gt; Add &quot;Spent Time&quot; as filter with these option values (for example):
    
    *   &gt;=
        
    *   &lt;=
        
    *   new (spent time == 0)