# Bug OP-14858 - Totals with ∑ 0h should be visible

Project: OpenProject
Status: closed
URL: https://community.openproject.org/work_packages/OP-14858

## Open points

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Module |  |
| Target versions | 14.0.0 |
| Observed in versions |  |
| Sprint | 14.0.0 |
| Backlog bucket |  |
| Bug found in version (deprecated) |  |
| Found in mobile app version |  |
| Follow-up feedback e-mail |  |
| Requires doc change | No |
| Accessibility | No |
| Pull preview |  |
| List |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Planning

| Attribute | Value |
| --- | --- |
| Relevance |  |

## Costs

| Attribute | Value |
| --- | --- |
| Votes |  |
| Work |  |
| Labor costs |  |

## Description

### Steps to reproduce

1.  In work-based or status-based progress calculation mode
2.  Create two work packages, parent and child
3.  Set child work and remaining work values to 0h

### What is the buggy behavior?

  - The total work for parent work package should be shown, even if it's 0h
  - The total remaining work for parent work package should be shown, even if it's 0h

### What is the expected behavior?

  - The total work for parent work package should be shown, even if it's 0h
  - The total remaining work for parent work package should be shown, even if it's 0h

### Screenshots and other files

<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/99113/content">

### Environment information

**OpenProject installation type**

- [x] Hosted cloud edition 
  - [x]  stage environment

**OpenProject version**

*pre-14.0*