# Feature OP-14708 - Budget: Spent (ratio) differentiates unit and labor costs

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-14708

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As a** project admin  
**I want to** see separately how much budget has been used for unit costs and labor costs  
**so that** I can better estimate whether the overall costs will stay within the budget

**Acceptance criteria**

\- A progress indicator (e.g. a bar) is displayed next to planned unit and labor costs and actual labor costs  
\- It is easy to identify whether the overall budget is still on track (see current situation below), e.g. with a table like this  
  
  

<figure class="table op-uc-figure_align-center op-uc-figure"><table class="op-uc-table"><tbody><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">planned unit costs</p></td><td class="op-uc-table--cell"><p class="op-uc-p">actual unit costs</p></td><td class="op-uc-table--cell"><p class="op-uc-p">budget left</p></td><td class="op-uc-table--cell"><p class="op-uc-p">progress bar</p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">planned labor costs</p></td><td class="op-uc-table--cell"><p class="op-uc-p">actual labor costs</p></td><td class="op-uc-table--cell"><p class="op-uc-p">budget left</p></td><td class="op-uc-table--cell"><p class="op-uc-p">progress bar</p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p"></p></td><td class="op-uc-table--cell"><p class="op-uc-p"></p></td><td class="op-uc-table--cell"><p class="op-uc-p"></p></td><td class="op-uc-table--cell"><p class="op-uc-p">calculated overall progress</p></td></tr></tbody></table></figure>

  
_Current situation_

the &quot;spent (ratio)&quot; bar includes both labor and unit costs which is too simple in some cases.  
Example: You planned unit costs but you did not use them yet. At the same time, you already used lots of labor costs. The spent (ratio) does not display that the unit costs are still to be added and therefore indicate a misleading trend.

<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/96867/content">

  

_Feature Request raised within support ticket 13994_
