# Feature OP-13594 - [Team Planner] Open-ended tasks (no start or no due date) are visualized as a single-day activity

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-13594

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 2 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

### Steps to reproduce

1.  create a work-package for a project
    *   either no start or no end date
2.  configure a team planner for the project
    *   so that the work-package is visible in the planner
3.  open the team planner

### What is the buggy behavior?

*   the team planner shows the work-package as a single-day work-package which is confusing/wrong

### What is the expected behavior?

1.  either do not show it at all
2.  show it as a long bar without an ending on the respective side