# Bug OP-13518 - Project Calender - Navigates to Previous Month w/ Every Filter Swap

Project: OpenProject
Status: closed
URL: https://community.openproject.org/work_packages/OP-13518

## Open points

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | High |
| Module |  |
| Target versions | 13.3.1 |
| Observed in versions |  |
| Sprint | 13.3.1 |
| Backlog bucket |  |
| Bug found in version (deprecated) |  |
| Found in mobile app version |  |
| Follow-up feedback e-mail |  |
| Requires doc change | No |
| Accessibility | No |
| Pull preview |  |
| List |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Planning

| Attribute | Value |
| --- | --- |
| Relevance |  |

## Costs

| Attribute | Value |
| --- | --- |
| Votes |  |
| Work |  |
| Labor costs |  |

## Description

### Before filing a report

_Before you file a report, please ensure you are running the latest version of OpenProject and_   
_have searched for similar bug reports._

### Steps to reproduce

_Please write down the steps to reproduce. Try to write down all necessary preconditions (what permissions do you have, are other users involved?). Example:_

1.  Login as user. (I am using Administrator settings, personally.)
2.  Navigate to any project calendar.
3.  Select any custom calendar/filter from the left navigation palette.
4.  Select weekly-view from top-right toggle.
5.  Switch to another Calendar view.
6.  Select monthly-view from top-right toggle.
7.  Watch the calendar change: it shows one month before current date.

### What is the buggy behavior?

_Please describe the bug in as much detail as possible. Example:_

*   Each time a user selects a new view inside the monthly calendar, the calendar changes to the month prior to the currently displayed month.
*   Example: Calendar shows September 2023, Select weekly-view, Select view &quot;test&quot; and change to monthly-view. Calendar changes to &quot;test&quot; view for the month of August 2023.

### What is the expected behavior?

_Describe how the application should behave like. Example:_

1.  Expected behavior is for the calendar to change what items are shown on the screen, but not to change the dates displayed on the screen.

### Important note

_Please note that unless you are a contributor to OpenProject, you can no longer edit this bug report after saving. You can still add new comments, but no longer add any new images or other attachments. Please make sure that all necessary information and attachments are added, and the following attributes are set:_

### **Logs**

_<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/73255/content">_<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/73256/content">

<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/73257/content"><img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/73258/content"><img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/73259/content">

### Screenshots and other files

_<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/73260/content">_

### Environment information

_Please check and fill out the following details to help us identify in what versions and distributions of OpenProject the error occurs_

**OpenProject installation type**

*   [x] Hosted cloud edition
*   [ ] Packaged installation
    *   What distribution?
*   [ ] Docker All-in-one container
*   [ ] Docker-compose installation
*   [ ] Other (please specify)

**OpenProject version**

_Cloud_

**Browser**

*   [x] Chrome
*   [ ] Firefox
*   [ ] Safari
*   [ ] Mobile Safari
*   [ ] Other (please specify)

**Language**

_English/English_
