# Bug OP-11457 - Total progress does not change color

Project: OpenProject
Status: closed
URL: https://community.openproject.org/work_packages/OP-11457

## Open points

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Module |  |
| Target versions | 13.1.0 |
| Observed in versions | 12.3.0 |
| Sprint | 13.1.0 |
| Backlog bucket |  |
| Bug found in version (deprecated) | 12.3.x |
| Found in mobile app version |  |
| Follow-up feedback e-mail |  |
| Requires doc change | No |
| Accessibility | No |
| Pull preview |  |
| List |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Planning

| Attribute | Value |
| --- | --- |
| Relevance |  |

## Costs

| Attribute | Value |
| --- | --- |
| Votes |  |
| Work |  |
| Labor costs |  |

## Description

### **Steps to reproduce**

*Please write down the steps to reproduce. Try to write down all necessary preconditions (what permissions do you have, are other users involved?). Example:*

1.  Login as project admin
2.  Open Budgets
3.  Make Planned labor costs smaller than Actual labor costs
4.  Total progress does not change color

### **What is the buggy behavior?**

*Please describe the bug with as most details as possible. Example:*

  - Total progress does not change color when become \>100%
  - Progress bar also does not reflect the status as it is still not completed and it seems like there is some room left.
  - Value in Available column changes its format from "X EUR" to "-EURX" as soon as the number becomes negative, is this correct behavior or not?

<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/41405/content"> <img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/41406/content">

### **What is the expected behavior?**

*Describe how the application should behave like. Example:*

1.  Total progress will be red if has value \>100%
2.  The bar should look completed.

### **Important note**

*Please note that unless you are a contributor to OpenProject, you can no longer edit this bug report after saving. You can still add new comments, but no longer add any new images or other attachments. Please make sure that all necessary information and attachments are added, and the following attributes are set:*

### **Logs**

*Are there errors in the browser console? (*[*Click here for information on how to open your browser's console*](https://webmasters.stackexchange.com/a/77337)*) For a local installation: Are there relevant logs output by* `_openproject logs_` *(packaged installation) (*[*click here for details*](https://docs.openproject.org/installation-and-operations/operation/monitoring/#show-logs)*) or in a log/production.log or /var/log/openproject/ ? Please attach error output in these log files if applicable*

### **Screenshots and other files**

<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/41065/content">

### **Environment information**

*Please check and fill out the following details to help us identify in what versions and distributions of OpenProject the error occurs*

**OpenProject installation type**

- [ ] Hosted cloud edition
- [ ] Packaged installation
    - What distribution?
- [ ] Docker All-in-one container
- [x] Docker-compose installation
- [ ] Other (please specify)

**OpenProject version**

*If you're not running on the cloud edition, please specify the version of OpenProject you're running. Example: v12.1.6*

**Browser**

- [x] Chrome
- [ ] Firefox
- [ ] Safari
- [ ] Mobile Safari
- [x] Edge

**Language**

Eng , Ru