# Feature OP-10056 - Calculate spent time & labor costs from progress%

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-10056

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 5 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manager  
**I want to** 

1\. fill in the hourly rate of each team member (already in place)

2\. work on projects usually filling the estimated time and progress%

3\. the spent time is then calculated from estimated time \* progress%

4\. the labor cost (spent) can be calculated from spent time \* hourly rate of the assignee.

5\. (optional) the total expected labor cost and remaining labor costs can be calculated too.

6\. in case of multiple assignee and at part time of the task (side feature?), the sum of hourly rate (at part time, too) is used to generate the labor cost.

**so that** I'm *able to collect the spent time and spent cost (and export in table)*

**Acceptance criteria**

  - *\[enter acceptance criteria\]*
  - *...*