# Epic FND-66 - Configuration transfer between test and production

Project: Stream workspace foundations
Status: new
URL: https://community.openproject.org/work_packages/FND-66

## Detailed specification

### Motivation and background information

Changes to configurations within schemas: workflows, fields, screens, permissions, notifications are usually created and tested in a non-production/ staging environment to ensure they work well. However, there is no built-in way to transfer these configurations directly into a live production environment. As a result, users must manually recreate configurations in production systems (Jira), which is time-consuming and prone to errors.

Users want a reliable way to transfer validated configurations from test systems to production without repeating the same setup steps from scratch.

### Acceptance criteria

### Out of scope

| Attribute | Value |
| --- | --- |
| Mockups |  |

## Planning

| Attribute | Value |
| --- | --- |
| Roadmap | 2027 Q4 |
| Date |  |
| Votes |  |
| List |  |
| Target versions |  |
| Sprint |  |
| Backlog bucket |  |
| Relevance |  |

## Subitems

_No work packages_

## Bugs and other work packages

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Enterprise plan |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager | Sonita Soth |
| Feature Lead |  |
| Designer | Parimal Satyal |
| Developers | OP Dev Comms Team |
| Requested by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| Work |  |

## Description

**As a** system administrator,

**I want to** be able to export configurations from a test system and import them into production,

**So that** I can reuse reuse setups more efficiently and avoid manual rework which takes time.