# Feature DREAM-426 - Overview widget for Budgets

Project: Stream Design System
Status: closed
URL: https://community.openproject.org/work_packages/DREAM-426

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | High |
| Target versions | 17.2.0 |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

| ID | Type | Subject | Status | Assignee | Target versions | Spent time | Module |
| --- | --- | --- | --- | --- | --- | --- | --- |
| OP-18985 | Bug | Budgets widget: Data from subitems is not aggregated if workspace type is not Portfolio | closed |  | 17.2.0 |  | Frontend components and Primer design system, Modules and project features / Costs and budgets, Modules and project features / Project overview |
| OP-18923 | Bug | Replace EUR with € in cost currency setting default and harmonize widgets | closed |  | 17.2.0 |  | Modules and project features / Project overview, Modules and project features / Costs and budgets |
| DREAM-622 | Bug | Titles and totals are cut off  | closed |  | 17.2.0 |  | Modules and project features / Project overview, Modules and project features / Costs and budgets |
| DREAM-637 | Bug | Rephrase 'Budget by cost type' subtitle for portfolios | closed |  | 17.2.0 |  | Modules and project features / Project overview, Modules and project features / Costs and budgets, Frontend components and Primer design system |
| DREAM-636 | Bug | Chart doesn't expand and Cost list is cut when costs go over budget | closed |  | 17.2.0 |  | Frontend components and Primer design system, Modules and project features / Costs and budgets, Modules and project features / Project overview |
| DREAM-635 | Bug | Colors in the 'Actual cost per month' graph legend and on the chart do not match if users do not have a set rate | closed |  | 17.2.0 |  | Modules and project features / Project overview, Modules and project features / Costs and budgets, Frontend components and Primer design system |
| DREAM-634 | Bug | Refine widget blankslate text and position | closed |  | 17.2.0 |  | Modules and project features / Project overview, Frontend components and Primer design system |
| DREAM-632 | Bug | 'Actual costs per months' widget does not show previous 12 months | closed |  | 17.2.0 |  | Modules and project features / Project overview, Modules and project features / Costs and budgets, Frontend components and Primer design system |
| DREAM-629 | Bug | Widget does not render with new currency format | closed |  | 17.2.0 |  | Modules and project features / Costs and budgets, Modules and project features / Project overview |

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Modules and project features / Project overview, Modules and project features / Costs and budgets, Frontend components and Primer design system |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview | https://pr-20966-66124-overview-ip-3-76-100-130.my.preview.run/ |
| Mockups | https://www.figma.com/design/kjzHe0qOLme1LXCjLoTBFV/Overview-and-Dashboard?node-id=585-21108 |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Developers | Alexander Coles |
| Designer | Marc Alcobé |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

<br>

**As** a project manager, portfolio manager and program manager  
**I want to** see the budgets on my Overview page  
**so that** I easily get an overview of the financial plan and status.

# **Motivation**

*   Understand how much budget was planned, spent and is available.
    
*   Make the project overview more useful and engaging.
    
    *   Improve onboarding
        
    *   Reduce churn
        

# **Acceptance criteria**

**Preconditions**

*   There are multiple new widgets for the Budgets module shown on the Overview page only
    
    *   Widgets shown only if Budgets and the Time&amp;Costs module is activated in the project.
        
    *   Widget shown only if necessary permissions are granted, see [https://community.openproject.org/documents/180](https://community.openproject.org/documents/180) for a detailed matrix
        

**Widgets**

*   Show 4 small widgets next to each other which display the following title and its value only:
    
    *   Total planned budget (€)
        
    *   Total actual costs (€)
        
    *   Spent ratio (%)
        
    *   Remaining budget (€)
        
*   The values for those widgets are build by Labour costs, Unit costs, and base amount
    
*   Technical note: All of that already exists as method on the Budget
    

<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/789564/content"></div></figure>

*   A new widget called &quot;**Total Budget by cost type**&quot; which shows a pie chart with all cost types currently in use
    
    *   Labour costs are also shown as an additional cost type (unless it is 0).
        
    *   Base amount is also shown as an additional cost type (unless it is 0).
        
    *   There is a link at the bottom &quot;View budget details&quot; redirecting to the budget index page (&quot;/budgets&quot;) of the current project
        
        *   The link opens in a new tab to avoid flow interruption
            
    *   Technical note: These are `MaterialBudgetItem` and `LaborBudgetItem`
        

<figure class="image image_resized op-uc-figure" style="width:336px;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/789565/content" alt="pie chart for Budget by cost type"></div></figure>

*   There is a new widget called &quot;**Actual cost per month**&quot;. It is a stacked bar chart for monthly actual costs:
    
    *   Each bar represents a month.
        
    *   Widget shows 12 full calendar months, ending with the current month
        
    *   The sum per month is shown at the top of each bar
        
    *   Colors indicate cost types.
        
    *   Labour costs are also shown as an additional cost type (unless it is 0).
        
    *   There is a link at the bottom &quot;View actual cost details&quot;
        
        *   It leads to the Cost reports with filter for the project (and possibly sub projects), and date spend is at least the month shown in the diagram
            
        *   The link opens in a new tab to avoid flow interruption
            
    *   Technical note: These are `CostEntry` and `TimeEntry` which share a common interface
        

<figure class="image image_resized op-uc-figure" style="width:390px;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/789566/content"></div></figure>

**Data**

*   Depending on the workspace and hierachy, the shown data is different:
    
    *   **Case 1: Single project only**
        
        *   All widgets display the **summed values of all budgets used within that project**
            
    *   **Case 2: Aggregation for portfolios, programs and sub-projects**
        
        *   All widgets display the **summed values of all budgets of itself and all subitems**
            
            *   When aggregating, make sure to not count budgets in the hierarchy twice
                
            *   Example:
                
                *   Program X: 4€ (aggregated)  
                    \-- own Budget: 2€  
                    \-- Project X.A: 1€  
                    \-- Project X.B: 1€
                    
                *   Portfolio Y: 6€ (aggregated)  
                    \-- own Budget: 2€  
                    \-- Program Y.C: 1€  
                    \-- Program Y.D: 3€ (aggregated)  
                    &nbsp; -- own Budget: 1€  
                      -- Project Y.D.1: 1€  
                      -- Project Y.D.2: 1€
                    
        *   There is a short summary written to explain that the budget is aggregated (e.g. &quot;Data aggregated from X budgets included in the %{workspace} and its subitems&quot;)
            

**Blankslates**

*   When no budgets are currently available, the &quot;Budget by cost type&quot; shows a Blankslate with
    
    *   icon: &quot;op-budget&quot;
        
    *   header: &quot;Start project controlling&quot;
        
    *   Description: &quot;Get an overview of your budgets and costs to efficiently track the health status of your project&quot;
        
    *   (Secondary) Button: &quot;+ Budget&quot; (will lead to the budget creation page)
        
*   When there is a budget but the planned costs are empty, the &quot;Budget by cost type&quot; shows a different blankslate:
    
    *   icon: &quot;graph&quot;
        
    *   header: &quot;No budget data&quot;
        
    *   Description: &quot;Add planned unit and labor costs to this project to start tracking the budget&quot;
        
    *   No button
        
*   When no logged times are currently available, the &quot;Actual costs by month&quot; widgets shows a Blankslate with
    
    *   icon: &quot;op-cost-reports&quot;
        
    *   header: &quot;Start tracking your time and costs&quot;
        
    *   Description: &quot;Get an overview of your costs and logged time to monitor progress of your project&quot;
        
    *   (Secondary) Button: &quot;Log time&quot; (will open the log time dialog)
        
*   When there are unit costs but the widget should still be empty, the &quot;Actual costs&quot; shows a different blankslate. This happens for example when the unit costs where booked over a year ago, or the rate was 0.
    
    *   icon: &quot;graph&quot;
        
    *   header: &quot;No data for current year&quot;
        
    *   Description: &quot;Log spent time and costs for work packages to start tracking actual costs&quot;
        
    *   No button
        

<br>

## **Technical notes**

*   We stick to the chart libary chart.js
    

## **Permissions and visibility considerations**

*   _We use the existing permissions._
    

## **Translation considerations**

*   _Key terms and phrases in the key languages_
    

## **Out of scope**

*   Changes to the budget module.
    
*   Include this information in the API (separate work package).
    
*   New widgets for the Dashboard
    

## Hints for QA

In order to render anything at all, budgets and charts need to be enabled and the user must have a number of permissions (in addition to the rights to view the project overview itself).

In order to render charts that show meaningful data, a large amount of example data is needed.

[https://community.openproject.org/documents/180](https://community.openproject.org/documents/180) lists what is needed in terms of prerequisites.