# Feature COSTS-61 - Separate tab "cost and time" in the work package details view that consolidate all cost and time related attributes

Project: Stream Time & Costs
Status: in specification
URL: https://community.openproject.org/work_packages/COSTS-61

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Product Backlog |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups | https://www.figma.com/design/xRFTkBJYxQJxwAf9fd3oM1/Log-time?node-id=1849-9381 |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Developers |  |
| Designer | Marc Alcobé |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project member  
**I want to** see all work package attributes that are related to "Cost and Time" in one tab independent of the work package type

**so that** I don't have search for them in each 

**Acceptance criteria**

  - There is a new tab "Cost and time".

  - This tab is shown once the module "time and costs" is activated in the project.

  - The tab includes a header section that shows the main attributes:
    
      - Work
    
      - Remaining work
    
      - % Complete
    
      - Spent time
    
      - Labor costs
    
      - Unit costs

  - In a second section "Time entries" the last 10 time entries are listed.
    
      - There is a link to the cost reports show all time entries.
    
      - The time entries can be filtered by user (all, user A, me)

  - In a third section "Unit costs" the last 10 cost entries are listed
    
      - There is a link to the cost reports to show all cost entries 

**Technical notes**

  - 
    <br>

**Permissions and visibility considerations**

  - *The permissions remain the same - no changes planned.*

**Out of scope**

  - Logging time in this view.