# Feature COMMS-703 - Adapt email notifications for project-based work package identifiers

Project: Stream Communicator
Status: closed
URL: https://community.openproject.org/work_packages/COMMS-703

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | 17.5.0 |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Use cases

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

| ID | Type | Subject | Status | Assignee | Target versions | Spent time | Module |
| --- | --- | --- | --- | --- | --- | --- | --- |
| COMMS-748 | Bug | Numeric ID in the email notification after adding watchers | closed |  | 17.5.0 |  | Modules and project features / Email notifications |
| COMMS-747 | Bug | Numeric ID still in the URL of the link opened from the email notification | closed |  | 17.5.0 |  | Modules and project features / Email notifications |

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Modules and project features / Notification center, Modules and project features / Email notifications |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers | Judith Roth |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a user of an instance that uses project-based semantic work package identifiers  
**I want to** see project-based work package identifiers in the notification center and emails

**Acceptance criteria**

  - If the instance is set to project-based work package identifiers
    
      - emails (e.g. notifications) use the project-based work package identifier instead of the database ID

**Technical notes**

  - 
    <br>

**Permissions and visibility considerations**

  - 
    <br>

**Translation considerations**

  - Previously, some strings to be translated and the translations included the "\#" before the global numeric identifier. Since the new project-based work package identifiers don't use a "\#" any more, this was removed from the translations and is added programmatically if necessary (therefore, if a global numeric identifier is used instead of a project-based identifier). **Those translations need to be adapted - the \# sign needs to be removed from the translation.**

**Out of scope**

  - 
    <br>

*Set the* **To be informed/consulted teams** *field to include all teams necessary to be informed of the changes.*
