# Epic AGILE-64 - Provide sprint reports for active and completed sprints

Project: Stream agile
Status: in development
URL: https://community.openproject.org/work_packages/AGILE-64

## Detailed specification

### Motivation and background information

*   material for reflection (retrospective)
    
*   indicators for team health-check
    
*   helps to understand performance, issues and through that helps the team to improve

### Acceptance criteria

How can users access the sprint reports?

  - via all sprints index page

  - via ... menu within backlog and sprints page

  - from the sprint board

Information visible on the 1st iteration (static page)

  - sprint goal

  - overview over wp \# within the sprint 
    
      - number of work packages initially planned for the sprint
    
      - number of work packages completed
    
      - number of work packages unfinished
    
      - number of work packages added additionally to the sprint during the sprint
    
      - \[open question\] sprint progress chart (unfinished / completed)

  - velocity chart (story points based) / more details within <mention class="mention" data-id="71903" data-type="work_package" data-text="#AGILE-66" data-display-id="AGILE-66">\#AGILE-66</mention>
    
      - 7 last completed sprints
    
      - committed / completed
    
      - average calculated based on the completed and visible sprints only (not only the line, but also the number)

  - burndown chart
    
      - we use the existing burndown chart

  - work package table: Completed work packages
    
      - Columns: ID, subject, type, status, assignee

  - work package table: Unfinished work packages

  - work package table: Scope change after sprint start

Information visible on the dynamic page

  - graph "Work package status"
    
      - showing the status of work packages within the sprint
    
      - we use the existing bar chart wp widget
        
          - \[open question\]: I think a pie / doughnut chart might work better in order to show how the entire sprint scope splits into statuses. Should we go for bar chart or another one? Julia: bar chart\!
    
      - the graph could quickly give an overview over the progress within the sprint
    
      - update on the existing graph: when I click on a certain bar I should be forwarded to the work package table (open in new tab) showing all the wp behind the bar, so that the bars are interactive

### Out of scope

*   changes to the existing burndown chart
    
*   burnup chart
    
*   Report on estimates
    
    *   compare estimated workload and workload logged on the wp
        
        *   &quot;over consumption&quot; (when workload on a WP is &gt; than the initial estimate)
            
*   possibility to change the order and size of widgets within the sprint report page
    
*   possibility to add new widgets to the sprint report page
    
*   possibility to integrate newly provided widgets (e.g. velocity chart) in the project dashboard
    
*   further, manual configuration of the velocity chart (e.g. timeline, number of sprints, points vs. wp vs. hours)
    
*   usage of baseline functionality
    

All the topics are desired, but will be addressed separately.

| Attribute | Value |
| --- | --- |
| Mockups | https://www.figma.com/design/owpxg3fdqZONIGL6SBSG8M/Agile--Sprint-reports?node-id=0-1&t=CxY3o2NyF0XJ9kr0-1 |

## Planning

| Attribute | Value |
| --- | --- |
| Roadmap | 2026 Q4 |
| Date | 2026-10-23 |
| Votes |  |
| List | Agile Reporting |
| Target versions | 18.0.0 |
| Sprint |  |
| Backlog bucket |  |
| Relevance | Important — Required Short-Term |

## Subitems

| ID | Type | Subject | Status | Assignee | Target versions | Project | Priority | Spent time |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| AGILE-296 | Feature | Sprint report page with burndown chart widget  | tested |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-297 | Feature | Sprint goal on sprint report page | tested |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-303 | Feature | Work package overview on sprint report page | tested |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-304 | Feature | Work package tables (completed, unfinished, added, removed) on sprint report page | in test | Ivana Šugić | 18.0.0 | Stream agile | Medium |  |
| AGILE-308 | Feature | Rework burndown chart | in test | Ivana Šugić | 18.0.0 | Stream agile | Medium |  |
| AGILE-360 | Feature | Work packages graph on sprint report page | tested |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-398 | Feature | Enterprise banner on reports page | review approved |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-455 | Feature | Scope change on work package overview widget counting story point changes | tested |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-469 | Feature | Screenreader compatible description of charts | specified | OP Dev Polaris Team | 18.0.0 | Stream agile | Medium |  |
| AGILE-498 | Implementation | Remove feature flag for reporting | specified |  | 18.0.0 | Stream agile | Medium |  |
| AGILE-467 | Open Point | Apply the backlogs definition of done for the whole reporting page  | decided |  |  | Stream agile | Medium |  |

## Bugs and other work packages

| ID | Type | Subject | Status | Assignee | Target versions | Module |
| --- | --- | --- | --- | --- | --- | --- |
| AGILE-274 | Task | Discovery work for sprint reports | closed | Julia Racsko |  |  |
| AGILE-467 | Open Point | Apply the backlogs definition of done for the whole reporting page  | decided |  |  |  |

## Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Enterprise plan | Community (COM) |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee | Julia Racsko |
| Accountable | Rosanna Sibora |
| Product manager | Rosanna Sibora |
| Designer | Julia Racsko |
| Developers | OP Dev Polaris Team |
| Requested by |  |
| Interest by | Black (37919), Home (224196000003952096) |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| Work | 45d 0h · Σ 45d 0h |

## Description

As a user I would like to understand the performance of the team within the completed sprint, so that we can reflect on it and get better.