# Epic AGILE-14 - Work-in-Progress-Limits for Kanban boards

Project: Stream agile
Status: new
URL: https://community.openproject.org/work_packages/AGILE-14

## Detailed specification

### Motivation and background information

Work-In-Progress (WIP) limits are a foundational principle of Lean and Kanban methodologies. They restrict the number of work items that can exist in a given workflow stage (board column) at any time. By limiting WIP, teams focus on finishing work before starting new tasks, which reduces context switching, exposes bottlenecks, and improves cycle time.

The WIP limits feature allows authorized users to set a maximum number of work packages per column on any agile board. When the limit is reached or exceeded, the board provides a clear visual warning. The system can be configured to either warn (soft limit) or prevent (hard limit) additional items from being added to the column. Within OpenProject we will go for the soft limit and visual indication that the limit was exceeded.

### Acceptance criteria

*   Set a WIP limit (maximum number of items) on any column of a Kanban or Scrum board.
    
*   We offer soft limits (visual warning only)
    
*   Display WIP limit alongside the current item count in the column header (e.g., &quot;In Progress 3/5&quot;).
    
*   Visual indicator when a column is at capacity (e.g., yellow highlight) or over capacity (e.g., red highlight).
    
*   WIP limits configurable per board, per column - not globally enforced.
    
*   Option to set WIP limits per swimlane (if swimlanes are enabled).
    
*   WIP limit violations logged in activity/history for retrospective analysis.
    
    *   Visible in the sprint report.
        
*   Admin/project manager can set, modify, or remove WIP limits; team members can view them.

### Out of scope

*   Hard limits (prevents adding items beyond the limit).
    
*   Notifications.

| Attribute | Value |
| --- | --- |
| Mockups |  |

## Planning

| Attribute | Value |
| --- | --- |
| Roadmap | 2027 Q2 |
| Date |  |
| Votes | 9 |
| List | cProject, RM Jira exit, RM Agile |
| Target versions |  |
| Sprint | 4. New boards - further releases |
| Backlog bucket |  |
| Relevance | Medium — Useful Mid-Term |

## Subitems

_No work packages_

## Bugs and other work packages

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Enterprise plan | Enterprise / Basic (BAS) |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable | Rosanna Sibora |
| Product manager | Rosanna Sibora |
| Feature Lead |  |
| Designer | Julia Racsko |
| Developers | OP Dev Polaris Team |
| Requested by |  |
| Interest by | Black (37919), Home (224196000003952096) |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| Work | 55d 0h |

## Description

As a Scrum Master / Product Owner / Team Member using OpenProject,  
I want to set and enforce Work-In-Progress (WIP) limits on columns of agile boards (Kanban and Scrum),  
So that my team can control the flow of work, reduce multitasking, identify bottlenecks early, and improve overall throughput and delivery predictability.