02/07/2026
-
updated by
Niels Lindenthal on 02/07/2026 05:59 PM - Priority changed from High to Medium
- Roadmap changed from 2027 Q1 to 2026 Q1
-
Idea #68776: Provide an alternative to Xray / allow test management (Subproject: Stream Jira fundamentals)updated by
Niels Lindenthal on 02/07/2026 05:02 PM - Roadmap set to 2026 Q4
- List set to RM Jira exit
-
Epic #37473: Automatically triggered custom actions (workflow automation) (Subproject: Stream Jira fundamentals)updated by
Niels Lindenthal on 02/07/2026 05:02 PM - Scheduling mode set to Manual
- Roadmap set to 2026 Q3
- List set to RM Jira exit
-
updated by
Niels Lindenthal on 02/07/2026 05:01 PM - Type changed from Idea to Epic
- Subject changed from Improve usability of workflows to Basic UX improvements for workflow editor
- Description changed (Details)
- Status changed from in specification to new
- Motivation and background information set (Details)
- Out of scope set (Details)
- Requires doc change set to No
- List set to RM Jira exit
- Roadmap set to 2027 Q1
- Acceptance criteria set (Details)
- Impact deleted (
High = 2x) - Effort (shirt size) deleted (
0.5 (M = 1 - 4 weeks)) - Reach deleted (
0.5 = Minimal reach (Less than ~5%)) - Confidence deleted (
Medium = 80%) - RICE Score deleted (
1.6)
-
Epic #39103: Different workflow for work package type in different projects (Subproject: Stream Jira fundamentals)updated by
Niels Lindenthal on 02/07/2026 04:01 PM - Enterprise plan set to Enterprise / Premium
- List set to RM Jira exit
-
updated by
Niels Lindenthal on 02/07/2026 04:01 PM - List changed from cProject to cProject, RM Jira exit
-
Epic #35357: Structure boards with swimlanes (Subproject: Stream agile)updated by
Niels Lindenthal on 02/07/2026 04:00 PM - Project changed from OpenProject to Stream agile
- Parent deleted ()
- List changed from cProject to cProject, RM Jira exit
-
Epic #65093: Jira import wizard for 'work items' (Subproject: Stream Jira to OpenProject data Migrator)updated by
Niels Lindenthal on 02/07/2026 03:54 PM - Subject changed from Jira Migration Tool V1 "Migrating work items" to Jira import wizard for 'work items'
- List set to RM Jira exit
-
updated by
Niels Lindenthal on 02/07/2026 03:53 PM - Subject changed from Introduce "Sprints" for Scrum projects to Introduce 'Sprints' for Scrum projects
-
Epic #57688: New frontend for Backlogs module (Subproject: Stream agile)updated by
Niels Lindenthal on 02/07/2026 03:51 PM - Subject changed from Harmonize Backlogs module with Primer design system to New frontend for Backlogs module
- List set to RM Jira exit
-
updated by
Niels Lindenthal on 02/07/2026 02:41 PM - Version deleted (
Product Backlog) - Enterprise plan set to Community
- Version deleted (
-
updated by
Niels Lindenthal on 02/07/2026 02:38 PM - Enterprise plan set to Community
-
Epic #65093: Jira Migration Tool V1 "Migrating work items" (Subproject: Stream Jira to OpenProject data Migrator)updated by
Niels Lindenthal on 02/07/2026 02:38 PM - Enterprise plan set to Community
-
updated by
Niels Lindenthal on 02/07/2026 02:35 PM - Status changed from in specification to in development
-
updated by
Niels Lindenthal on 02/07/2026 02:26 PM - Type changed from Feature to Epic
- Parent deleted (
Introduce 'Sprints' for Scrum projects) - Roadmap set to 2026 Q1
- Enterprise plan set to Community
-
updated by
Niels Lindenthal on 02/07/2026 02:16 PM - Subject changed from Backlogs should include task from subprojects to Backlogs should include tasks from subprojects
-
Epic #39103: Different workflow for work package type in different projects (Subproject: Stream Jira fundamentals)updated by
Niels Lindenthal on 02/07/2026 02:13 PM - Type changed from Idea to Epic
- Status changed from needs clarification to in specification
- Roadmap set to 2026 Q3
- Requires doc change set to No
- Reach deleted (
1.5 = Small reach (~5% to ~25%))
02/06/2026
-
Implementation #71252: Automatically generate Sprint name sequence & create Sprint modal (Subproject: Stream agile)updated by
Tobias Dillmann on 02/06/2026 04:04 PM - Status changed from in specification to in development
- Assignee set to Tobias Dillmann
-
Epic #37473: Automatically triggered custom actions (workflow automation) (Subproject: Stream Jira fundamentals)updated by
Samantha Machon on 02/06/2026 02:52 PM -
Comment added
+1 from customer
- Description changed (Details)
- Votes changed from 26 to 28
-
Comment added
-
updated by
Alexander Coles on 02/06/2026 12:10 PM - Assignee changed from Henriette Darge to Alexander Coles
-
updated by
Oliver Günther on 02/06/2026 08:38 AM - Assignee changed from Alexander Coles to Henriette Darge
-
updated by
Alexander Coles on 02/06/2026 08:27 AM - Status changed from in development to needs review
02/05/2026
-
updated by
Alexander Coles on 02/05/2026 07:45 PM - Description changed (Details)
-
updated by
GitHub on 02/05/2026 06:46 PM - Comment added
-
updated by
GitHub on 02/05/2026 05:41 PM - Comment added
-
Implementation #71252: Automatically generate Sprint name sequence & create Sprint modal (Subproject: Stream agile)updated by
Tobias Dillmann on 02/05/2026 02:58 PM - Subject changed from Automatically generate Sprint name sequence to Automatically generate Sprint name sequence & create Sprint modal
- Description changed (Details)
-
updated by
Parimal Satyal on 02/05/2026 02:45 PM -
Comment added
Hi team,
Just had a chat with Jens Ulferts and Tobias Dillmann so we can unblock
Tobi will be working on the sprint cr...
-
Comment added
-
updated by
GitHub on 02/05/2026 12:18 PM - Comment added
-
updated by
Tobias Dillmann on 02/05/2026 12:15 PM - Status changed from new to in development
-
Implementation #71396: Allow new issues to be imported for already migrated project (Subproject: Stream Jira to OpenProject data Migrator)created by
Pavel Balashou on 02/05/2026 12:11 PM -
Implementation #71395: Create a tool to populate Jira with projects and issues (Subproject: Stream Jira to OpenProject data Migrator)created by
Pavel Balashou on 02/05/2026 12:02 PM -
Open Point #71394: How does Jira Epic short title work? Where is it stored? (Subproject: Stream Jira to OpenProject data Migrator)created by
Pavel Balashou on 02/05/2026 12:01 PM -
Implementation #71393: Improve UX of project modal selection dialog (Subproject: Stream Jira to OpenProject data Migrator)created by
Pavel Balashou on 02/05/2026 12:00 PM -
Implementation #71392: Introduce a state machine with transition log (Subproject: Stream Jira to OpenProject data Migrator)created by
Pavel Balashou on 02/05/2026 11:58 AM -
Implementation #71130: Be able to cancel long running migration phases (Subproject: Stream Jira to OpenProject data Migrator)updated by
Pavel Balashou on 02/05/2026 11:57 AM - Type changed from Feature to Implementation
- Description deleted (Details)
- Status changed from in specification to in development
-
Feature #70496: Introduce sprints and replace versions in current backlogs view (Subproject: Stream agile)updated by
Jens Ulferts on 02/05/2026 09:57 AM - Description changed (Details)
-
Open Point #71386: Required permissions for adding/removing work packages from a sprint (Subproject: Stream agile)created by
Jens Ulferts on 02/05/2026 09:53 AM -
Comment added
Rosanna Sibora , can you please clarify the intend regarding the permissions?
-
Comment added
-
Feature #70496: Introduce sprints and replace versions in current backlogs view (Subproject: Stream agile)updated by
Tobias Dillmann on 02/05/2026 09:14 AM - Description changed (Details)
-
updated by
Tobias Dillmann on 02/05/2026 09:06 AM -
Comment added
Yes, the manage_sprints permission allows this. Defined in
- Status changed from new to decided
- % Complete set to 100%
- Decision set to Yes, `manage_sprints`
-
Comment added
-
updated by
Tobias Dillmann on 02/05/2026 09:06 AM - Description changed (Details)
-
updated by
Tobias Dillmann on 02/05/2026 09:01 AM - Description set (Details)
-
Epic #71381: Introduce burnup charts (TBD) (Subproject: Stream agile)created by
Rosanna Sibora on 02/05/2026 07:52 AM -
updated by
GitHub on 02/05/2026 01:23 AM - Comment added
-
updated by
GitHub on 02/05/2026 12:25 AM - Comment added
-
updated by
Alexander Coles on 02/05/2026 12:02 AM -
Comment added
Hi Parimal Satyal ,
this screenshot should illustrate how items are laid out within a story row using a grid::
You can a...
-
Comment added
02/04/2026
-
Implementation #71248: Create Sprint model (Subproject: Stream agile)updated by
Tobias Dillmann on 02/04/2026 06:21 PM - Status changed from in development to needs review
- Assignee deleted (
Tobias Dillmann) - Developers set to Tobias Dillmann
-
Implementation #71248: Create Sprint model (Subproject: Stream agile)updated by
GitHub on 02/04/2026 06:19 PM - Comment added
-
Implementation #71248: Create Sprint model (Subproject: Stream agile)updated by
Tobias Dillmann on 02/04/2026 04:32 PM - Description changed (Details)
-
created by
Tobias Dillmann on 02/04/2026 03:56 PM -
updated by
Tobias Dillmann on 02/04/2026 03:55 PM - Decision set to No automatic scheduling for now.
-
Open Point #71242: Sharing active Sprints potentially leading to a multiple active Sprints per project (Subproject: Stream agile)updated by
Jens Ulferts on 02/04/2026 03:15 PM -
Comment added
Tobias Dillmann , Parimal Satyal , based on a meeting with Rosanna Sibora and Attila Dombi :
We will have sprint shari...
-
Comment added
-
Epic #37473: Automatically triggered custom actions (workflow automation) (Subproject: Stream Jira fundamentals)updated by
Colin Puskaritz on 02/04/2026 03:01 PM -
Comment added
+1 from customer
Also, a related actions which would be useful are:
Setting the Start Date to today's date when Status...
-
Comment added
-
Epic #71368: Introduce backlog buckets (TBD) (Subproject: Stream agile)created by
Rosanna Sibora on 02/04/2026 10:48 AM -
updated by
Rosanna Sibora on 02/04/2026 08:56 AM -
Comment added
something we probably want to discuss a bit over a call
I agree! Let's have a chat about this wp and sharing in genera...
-
Comment added
-
Idea #39103: Different workflow for work package type in different projects (Subproject: Stream Jira fundamentals)updated by
Dominic Bräunlein on 02/04/2026 08:22 AM -
Comment added
+1 from Corporate user
- Votes changed from 8 to 9
- Impact deleted (
Low = 0.5x)
-
Comment added
-
Feature #71356: Support old Jira links after migration (Subproject: Stream Jira to OpenProject data Migrator)created by
Pavel Balashou on 02/04/2026 08:15 AM
02/03/2026
-
updated by
Rosanna Sibora on 02/03/2026 05:47 PM -
Comment added
Hi Parimal Satyal,
ok, thanks! I leave it to you.
Take care,
Rosanna
-
Comment added
-
Open Point #71243: Can users stop a Sprint? (Subproject: Stream agile)updated by
Rosanna Sibora on 02/03/2026 05:24 PM -
Comment added
Hi Parimal Satyal,
Is this distinction not relevant? The latter I've already added to the mockups, but not the former.
...
-
Comment added
-
updated by
Parimal Satyal on 02/03/2026 05:19 PM -
Comment added
Had a live review of the UX with Alexander Coles, the decisions pertaining to the points raised previously (and from my ...
-
Comment added
-
Task #70741: Rename Sharing field for Sprints (Subproject: Stream agile)updated by
Rosanna Sibora on 02/03/2026 05:14 PM - Assignee changed from Esther Hassan to Parimal Satyal
-
Open Point #71243: Can users stop a Sprint? (Subproject: Stream agile)updated by
Parimal Satyal on 02/03/2026 05:12 PM -
Comment added
Hi Rosanna Sibora,
I saw "Stop sprint" as a completely different action than completing a sprint.
Stop: interrupt but...
-
Comment added
-
Open Point #71238: Should the new work package modal be adapted for backlogs? (Subproject: Stream agile)updated by
Alexander Coles on 02/03/2026 03:30 PM -
Comment added
Hi Henriette Darge / Attila Dombi ,
what are your thoughts on this? Although I prefer to create reusable components, I t...
- Status changed from new to needs clarification
-
Comment added
-
updated by
Alexander Coles on 02/03/2026 03:15 PM -
Comment added
Hi Parimal Satyal , Rosanna Sibora ,
I'd be grateful if I could get some feedback on text and UX.
Cheers,
Alex
Flash Me...
-
Comment added
-
updated by
Alexander Coles on 02/03/2026 02:55 PM -
Comment added
Hi Parimal Satyal ,
Since our last call I've addressed most of your feedback:
the look and feel of the Border Boxes is...
-
Comment added
-
Open Point #71242: Sharing active Sprints potentially leading to a multiple active Sprints per project (Subproject: Stream agile)updated by
Rosanna Sibora on 02/03/2026 02:42 PM -
Comment added
Hi Tobias Dillmann & Parimal Satyal,
Mid term (Q2-Q3) we want to allow multiple active sprints within one project an...
- Assignee changed from Rosanna Sibora to Tobias Dillmann
-
Comment added
-
updated by
Alexander Coles on 02/03/2026 01:46 PM - Pull preview set to https://pr-21723-57688-primeriz-ip-3-71-107-105.my.preview.run/
-
Implementation #71248: Create Sprint model (Subproject: Stream agile)updated by
GitHub on 02/03/2026 11:24 AM - Comment added
-
updated by
Rince wind on 02/03/2026 11:01 AM -
Comment added
Thank you Jens Ulferts and everyone! This is very much appreciated
-
Comment added
-
updated by
Rosanna Sibora on 02/03/2026 10:29 AM -
Comment added
Hi Parimal Satyal,
No automatic scheduling for now.
Also, we should think about how to deal with WP dates that are diff...
- Status changed from new to decided
- % Complete set to 100%
-
Comment added
-
updated by
Esther Hassan on 02/03/2026 10:28 AM - Description changed (Details)
-
Open Point #71243: Can users stop a Sprint? (Subproject: Stream agile)updated by
Tobias Dillmann on 02/03/2026 10:26 AM -
Comment added
Please note that with regards to sharing, completing a Sprint in one project would potentially complete it in other proj...
-
Comment added
-
Open Point #71243: Can users stop a Sprint? (Subproject: Stream agile)updated by
Rosanna Sibora on 02/03/2026 10:03 AM -
Comment added
Hi Parimal Satyal & Tobias Dillmann,
As for Tobi's question, I think adding a "Stop sprint" option to the more drop...
-
Comment added
-
updated by
Jens Ulferts on 02/03/2026 08:13 AM - Description changed (Details)
02/02/2026
-
updated by
Parimal Satyal on 02/02/2026 06:29 PM -
Comment added
Hi Jens Ulferts,
Nope. It's straightforward and clear.
Cheers
Parimal
- Description changed (Details)
-
Comment added
-
Open Point #71243: Can users stop a Sprint? (Subproject: Stream agile)updated by
Parimal Satyal on 02/02/2026 06:12 PM -
Comment added
Hi Rosanna Sibora,
Yes, I'll need illustrate this 'Complete sprint' dialogue to the mockups 👍 I don't think there's a us...
-
Comment added
-
updated by
Parimal Satyal on 02/02/2026 06:08 PM -
Comment added
Hi Jens Ulferts, Rosanna Sibora:
I think Jens' concern about certain users possibly not seeing certain sprints (like in ...
-
Comment added
-
Feature #70496: Introduce sprints and replace versions in current backlogs view (Subproject: Stream agile)updated by
Attila Dombi on 02/02/2026 01:27 PM - Description changed (Details)
-
updated by
Attila Dombi on 02/02/2026 01:23 PM -
Comment added
Updated automatically by changing values within child work package #71308
- Description changed (Details)
- Scheduling mode set to Automatic
-
Comment added
-
created by
Attila Dombi on 02/02/2026 01:23 PM -
Open Point #71243: Can users stop a Sprint? (Subproject: Stream agile)updated by
Parimal Satyal on 02/02/2026 01:20 PM -
Comment added
Hi Tobias Dillmann. Great question. We hadn't considered this need, but I see a couple of cases where it might be useful...
- Status changed from new to needs clarification
- Assignee set to Parimal Satyal
- Involved people set to Parimal Satyal, Rosanna Sibora
-
Comment added
-
Open Point #71242: Sharing active Sprints potentially leading to a multiple active Sprints per project (Subproject: Stream agile)updated by
Parimal Satyal on 02/02/2026 01:14 PM -
Comment added
Excellent point Tobias Dillmann. You are right that we were principally focusing on the one-active-sprint-per-project-ap...
- Status changed from new to needs clarification
- Assignee set to Rosanna Sibora
-
Comment added
-
Open Point #71274: What to do with Impediments? (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 01:07 PM -
Comment added
Proabable decision:
Remove impediments
Wait with removal until the task board is removed/replaced
-
Comment added
-
updated by
Parimal Satyal on 02/02/2026 01:01 PM -
Comment added
Need Rosanna Sibora's input on this, but in my opinion, this is not required for v1.
Also, we should think about how to ...
-
Comment added
-
Open Point #71238: Should the new work package modal be adapted for backlogs? (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 01:00 PM - Decision set to For the scope of the Primerization (keep the modal as is). No decision on the long term solution now
-
Idea #70121: Display tasks within backlog (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 12:28 PM - Parent set to Filter work package types displayed in backlog module
-
Epic #71146: Introduce default project "Backlog" (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 12:22 PM -
Comment added
Updated automatically by changing values within child work package #71305
- Scheduling mode set to Automatic
-
Comment added
-
created by
Jens Ulferts on 02/02/2026 12:22 PM -
Comment added
Updated automatically by changing values within child work package #70121
-
Comment added
-
Feature #35358: Boards - Kanban WIP Limits (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 09:29 AM -
Comment added
Merging into #50178 to avoid duplication
- Status changed from new to rejected
- % Complete set to 100%
-
Comment added
-
Feature #70496: Introduce sprints and replace versions in current backlogs view (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 09:22 AM - Subject changed from Introduce sprints and replace versions in current backlogs to Introduce sprints and replace versions in current backlogs view
-
Open Point #71238: Should the new work package modal be adapted for backlogs? (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 09:21 AM - Project changed from Stream Design System to Stream agile
-
updated by
Jens Ulferts on 02/02/2026 09:21 AM - Project changed from Stream Design System to Stream agile
- Parent set to Introduce 'Sprints' for Scrum projects
-
updated by
Jens Ulferts on 02/02/2026 09:15 AM - Version set to 17.4.0
-
updated by
Jens Ulferts on 02/02/2026 09:12 AM -
Comment added
Adding votes from
- Parent deleted (
Automatic sprint board creation) - Votes set to 9
-
Comment added
-
Implementation #71254: Delete old Sprint model (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 09:02 AM - Type changed from Feature to Implementation
- Version set to 17.2.0
-
updated by
Jens Ulferts on 02/02/2026 09:02 AM - Type changed from Feature to Implementation
- Status changed from needs clarification to new
- Version set to 17.2.0
-
updated by
Jens Ulferts on 02/02/2026 09:02 AM - Type changed from Feature to Implementation
- Version set to 17.2.0
-
updated by
Jens Ulferts on 02/02/2026 09:02 AM - Type changed from Feature to Implementation
- Version set to 17.2.0
-
Implementation #71250: Update existing backlogs view to use the new model (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 09:02 AM - Type changed from Feature to Implementation
- Version set to 17.2.0
-
Implementation #71248: Create Sprint model (Subproject: Stream agile)updated by
Jens Ulferts on 02/02/2026 09:02 AM - Type changed from Feature to Implementation
- Version set to 17.2.0